We started working on the house last weekend. We still didn't have electric so there was only so much we could do. First was to move dirt into the trench around the inside of the foundation. This would have been done by the excavator but he isn't coming back until he can dig the septic and we don't want to wait for that. So after ?? loads of mud (yes, it was mud), we had the whole trench filled.
While Mom, Eric and I (and Tanner) worked on that Dad was making the sill plate and planning and preparing to make the beam. Madison was Dad's "go for" and she had a great time. We got alot accomplished until we realized that the pillars weren't all the same height.
We did realize that we needed to get some type of electric, sawing wood by hand is just too tiring, and I was just watching Dad.
Saturday, June 6, 2009
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment